Railfuture Library
This page is showing just one of many types of document files that can be viewed (if your browser has the facility) or downloaded.
Click [TYPES] to see each type, or click [FULL] to see every file available (allow 30 seconds to display).
Railfuture has 12 branches in England plus Wales and Scotland which are involved in local issues and come together to support Railfuture on national campaigns. Click on [BRANCHES] to see details of them (and click [NEWSLETTERS] for a list of latest newsletter for all branches).
If your browser is not configured to view a file then click the 'file size' to download it.
Submissions
More info or other links can be found at Consultation responses
18/01/2021 - Railfuture L&SE response to Wealden Local Plan Direction of Travel (191kB)
15/01/2021 - Railfuture response to Commons Transport Committee on major infrastructure projects (142kB)
04/01/2021 - Railfuture response to DfT Heavier intermodal freight trial (137kB)
30/12/2020 - Railfuture response to DfT Union Connectivity review (658kB)
30/12/2020 - Railfuture Thames Valley response to Oxfordshire Growth Board Strategic Vision (575kB)
21/12/2020 - Railfuture Wessex response to draft Portsmouth Transport Strategy (831kB)
18/12/2020 - Railfuture response to EDF Energy on Sizewell C (202kB)
17/12/2020 - Railfuture L&SE response to W. Sussex CC Transport Plan Review survey (104kB)
11/12/2020 - Railfuture L&SE response to East Sussex CC on first LCWIP (78kB)
01/12/2020 - Railfuture L&SE response to Homes England on West of Ifield, W. Sussex (88kB)
29/11/2020 - Railfuture response to Network Rail on Cambridge South station - 2nd round (160kB)
17/11/2020 - Railfuture L&SE response to Kent Rail Strategy 2021 (325kB)
15/11/2020 - Railfuture L&SE response to Luton BC draft Local Transport Plan (175kB)
01/11/2020 - Railfuture response to Network Rail Ely Area Capacity Enhancement (215kB)
29/10/2020 - Railfuture response to MHCLG White Paper 'Planning for the future' (182kB)
14/10/2020 - Railfuture L&SE response to Surrey Rail Strategy survey (290kB)
06/10/2020 - Railfuture response to England's Economic Heartland draft Transport Strategy (227kB)
05/10/2020 - Railfuture Thames Valley response to West Oxon DC draft Eynsham Garden Village AAP (183kB)
29/09/2020 - Railfuture submission to Planning Inspectorate on Sizewell C (87kB)
22/09/2020 - Railfuture submission to HM Treasury's Autumn 2020 Comprehensive Spending Review (303kB)
21/09/2020 - Railfuture L&SE response to London Resort pre-DCO (185kB)
20/09/2020 - Railfuture L&SE response to Network Rail CARS - 2 (117kB)
13/09/2020 - Railfuture East Midlands response to Greater Nottingham Strategic Plan Growth Options (279kB)
31/08/2020 - Railfuture response to DfT Transport Decarbonisation Plan (59kB)
15/08/2020 - Railfuture response to National Infrastructure Commission Interim Report on Rail Needs Assessment for the Midlands and the North (158kB)
14/08/2020 - Railfuture Wessex response to Eastleigh BC re Soton Airport (48kB)
24/07/2020 - Railfuture Severnside & Wessex response to Western Gateway draft Transport Strategy (188kB)
29/05/2020 - Railfuture response to National Infrastructure Commission Call for Evidence on Rail Needs Assessment for the Midlands and the North (220kB)
23/05/2020 - Railfuture East Midlands response to Leicester & Leicestershire Strategic Transport Priorities (879kB)
11/05/2020 - Railfuture L&SE response to Medway Council on Hoo Peninsula growth (190kB)
27/04/2020 - Railfuture Thames Valley response to Oxon CC LTCP5 (590kB)
19/04/2020 - Railfuture L&SE response to DfT on Newhaven Marine station closure (80kB)
06/04/2020 - Railfuture L&SE response to Network Rail on Reigate station upgrade (112kB)
30/03/2020 - Railfuture L&SE response to Hertfordshire CC draft Rail Strategy (433kB)
23/03/2020 - Railfuture L&SE response to 'Future Mole Valley' (294kB)
18/03/2020 - Railfuture Severnside response to Gloucestershire LTP4 review (265kB)
02/03/2020 - Railfuture response to Network Rail on Cambridge South station (106kB)
14/02/2020 - Railfuture response to ORR Accessibility of rail replacements (91kB)
07/02/2020 - Railfuture response to EMR Dec '20 timetable (863kB)
24/01/2020 - Railfuture L&SE response to Eastbourne BC Local Plan issues & options (145kB)
10/01/2020 - Railfuture response to TfSE draft Transport Strategy (210kB)
31/12/2019 - Railfuture Wessex response to Western Gateway Rail Strategy (1.4MB)
22/12/2019 - Railfuture L&SE response to Bakerloo Line Extension consultation-3 (26kB)
21/12/2019 - Railfuture response on SWR proposals for Dec '20 timetable (28kB)
06/11/2019 - Railfuture Thames Valley response to West Oxon DC Preferred Options for Eynsham AAP (130kB)
31/10/2019 - Railfuture L&SE response to C2C LEP's Local Industrial Strategy (279kB)
31/10/2019 - Railfuture response to England's Economic Heartland Outline Transport Strategy (207kB)
25/09/2019 - Railfuture East Anglia response to Cambs and Peterborough CA LTP (417kB)
31/07/2019 - Railfuture response to TfSE draft statutory body proposal (166kB)
26/07/2019 - Railfuture L&SE response to Network Rail on Norwood Junction (6kB)
05/07/2019 - Railfuture L&SE response to SE LEP Coastal Communities Economic Prospectus (126kB)
25/06/2019 - Railfuture Thames Valley response to West Oxon DC on East Witney SPD (193kB)
21/05/2019 - Railfuture Severnside response to Bristol Local Plan (112kB)
25/04/2019 - Railfuture Scotland response to Edinburgh Waverley MasterPlan (18kB)
12/04/2019 - Railfuture Thames Valley response to OxPlan 2050 Call for Ideas (96kB)
14/03/2019 - Railfuture Thames Valley response to Introducing OxPlan 2050 (631kB)
11/03/2019 - Railfuture response to EWR Co central section Route Options (139kB)
10/03/2019 - Railfuture L&SE response to LBBD Barking station (77kB)
04/03/2019 - Railfuture Severnside response to West of England CA joint LTP4 (102kB)
27/01/2019 - Railfuture response to Northern Powerhouse Rail business survey (766kB)
18/01/2019 - Railfuture response to ORR Disabled People's Protection Policy (164kB)
18/01/2019 - Railfuture response to the Williams Rail Review (943kB)
13/01/2019 - Railfuture L&SE response to CoLC draft Transport Strategy (114kB)
11/01/2019 - Railfuture Cymru response to EIS Inquiry on Future development of TfW (857kB)
10/01/2019 - Railfuture L&SE response to GAL draft Master Plan (98kB)
10/01/2019 - Railfuture Severnside response to G,C &T Joint Core Strategy Review (398kB)
09/01/2019 - Railfuture Proof of Evidence for EWR Inquiry (194kB)
06/01/2019 - Railfuture L&SE response to TfL Sutton Link (90kB)
20/12/2018 - Railfuture Severnside response to WoE CA Joint Spatial Plan Technical Evidence (321kB)
17/12/2018 - Railfuture L&SE response to Network Rail CARS - 1 (80kB)
19/11/2018 - Railfuture response to West Midlands Rail Investment Strategy (159kB)
16/11/2018 - Railfuture L&SE response to DfT Angel Road station closure (28kB)
09/11/2018 - Railfuture Wales response to EIS Rail Franchise and Metro Scrutiny (500kB)
01/11/2018 - Railfuture response to ORR timetable inquiry phase 2 (318kB)
25/10/2018 - Railfuture Severnside response to Draft Bristol Transport Strategy (393kB)
18/10/2018 - Railfuture Statement of Case for EWR Inquiry (133kB)
12/10/2018 - Railfuture L&SE response to LTW Overground ticket office closures (89kB)
08/10/2018 - Railfuture L&SE response to Wealden Local Plan (1.5MB)
21/09/2018 - Railfuture Severnside response to Somerset draft Transport Strategy (325kB)
07/09/2018 - Railfuture response to RDG Easier fares (962kB)
07/09/2018 - Railfuture Thames Valley response to NR TWAO application for EWR Western section Phase 2 (87kB)
30/08/2018 - Railfuture L&SE response to GLA Budget & Performance Committee (139kB)
29/08/2018 - Railfuture response to DfT XCountry franchise - letter (208kB)
29/08/2018 - Railfuture response to XCountry franchise - survey (7.8MB)
22/08/2018 - Railfuture Thames Valley response to West Oxon DC on SDA for West Eynsham (159kB)
15/08/2018 - Railfuture Severnside response to Taunton Transport Strategy (305kB)
14/08/2018 - Railfuture response to DEFRA Air quality (101kB)
06/08/2018 - Railfuture response to Cheshire/Warrington LEP draft Transport Strategy (200kB)
31/07/2018 - Railfuture response to GLA Call for Evidence (138kB)
31/07/2018 - Response to ORR timetable Inquiry, Thameslink & Great Northern (150kB)
24/07/2018 - Submission to Commons Transport Committee Rail timetable changes inquiry (389kB)
23/07/2018 - Railfuture response to ORR timetable inquiry, Northern & TPE (231kB)
20/07/2018 - Railfuture Thames Valley response to West Oxon DC Issues for Eynsham Garden Village (161kB)
19/06/2018 - Railfuture response to TfSE Economic Connectivity Review (375kB)
31/05/2018 - Railfuture East Anglia response to New Anglia LEP ITS (163kB)
31/05/2018 - Railfuture response to RVR TWAO application (109kB)
11/05/2018 - Railfuture response to Medway Local Plan (432kB)
17/04/2018 - Railfuture response to Yorkshire Dales Management Plan (676kB)
16/04/2018 - Railfuture response to TfN Long Term Rail Strategy (793kB)
13/04/2018 - Railfuture response to SWR questionnaire on Boxing Day Services (93kB)
08/04/2018 - Railfuture response to Cheltenham Local Plan consultation (317kB)
23/03/2018 - Response to Coast2Capital Local Enterprise Partnership Strategic Economic Plan (124kB)
16/03/2018 - Network Rail East Coast Main Line Route Study (91kB)
18/02/2018 - Railfuture response to GW franchise consultation 2018 (503kB)
14/02/2018 - Railfuture response to EIS Active Travel consultation (528kB)
13/02/2018 - SWR Optimisation of Train Services (534kB)
31/01/2018 - Railfuture response to NR consultation on East West Rail (5kB)
30/01/2018 - Railfuture response to ORR consultation Improving Assisted Travel (298kB)
28/01/2018 - DfT Community Rail Consultation response (258kB)
23/01/2018 - Railfuture response to Herts CC consultation on LTP4 (155kB)
06/01/2018 - Response to TfL Canary Wharf-Rotherhithe river crossing (20kB)
31/12/2017 - Railfuture response to SWR consultation on future for Island Line (235kB)
20/12/2017 - Railfuture response to GTR 2018 timetable consultation phase 3 (152kB)
18/12/2017 - Railfuture response to SWR Dec 2018 timetable consultation (473kB)
29/11/2017 - Railfuture response to Travelwest Stage 2 consultation (46kB)
22/11/2017 - Railfuture response to draft Transport Accessibility Action Plan (338kB)
20/11/2017 - Railfuture response to South Downs Local Plan (25kB)
17/11/2017 - Railfuture response to TfL Old Oak Common Overground stations (18kB)
12/10/2017 - Railfuture response to consultation on Holborn station (20kB)
11/10/2017 - Railfuture response to HS2 Crewe Hub consultation (309kB)
10/10/2017 - Railfuture response on next East Midlands franchise (827kB)
02/10/2017 - Railfuture response to Mayor of London's draft Transport Strategy 2017 (405kB)
11/08/2017 - Railfuture response to NR consultation on East West Rail (98kB)
27/07/2017 - Railfuture response to GTR 2018 timetable consultation phase 2 (155kB)
30/06/2017 - Railfuture response to draft Kent Area Route Study (441kB)
29/06/2017 - Railfuture response on next South Eastern franchise (401kB)
25/05/2017 - Railfuture response to the consultation on the Draft Airports National Policy Statement (495kB)
12/03/2017 - Railfuture response to Kent CC Freight Action Plan consultation (62kB)
07/03/2017 - Railfuture response to National Development Framework for Wales consultation (267kB)
22/02/2017 - Railfuture Cymru/Wales response to Welsh Transport Appraisal Guidance consultation (354kB)
22/02/2017 - Railfuture response to Network Rail's Hansford Review (493kB)
20/02/2017 - Railfuture Cymru/Wales response to Welsh Assembly Economy, Infrastructure and Skills Committee inquiry into Wales and Borders Rail Franchise (473kB)
22/01/2017 - Railfuture East Anglia response to EDF Sizewell C, stage 2 (1.3MB)
17/01/2017 - Railfuture response to CrossCountry Future Timetable Consultation (292kB)
05/01/2017 - Railfuture response to National Infrastructure Commission for Wales consultation (349kB)
18/12/2016 - Railfuture response to West of England Joint Spatial Plan consultation (409kB)
16/12/2016 - Railfuture response to West of England Joint Transport Plan consultation (276kB)
14/12/2016 - Railfuture response to Herts CC consultation on TV2050 (410kB)
08/12/2016 - Railfuture response to GTR 2018 timetable consultation (354kB)
09/11/2016 - Railfuture response to NR's Freight Network Study (190kB)
30/10/2016 - Railfuture response to Kent CC consultation on LTP4 2016-31 (687kB)
12/10/2016 - Railfuture response to Barking Riverside TWAO application (125kB)
22/09/2016 - Railfuture response to NR draft West Mids & Chilterns Route Study (248kB)
09/09/2016 - Response to Gloucester City Council Kings Quarter consultation (190kB)
02/09/2016 - Letter to Network Rail re closure of Pilning down platform (182kB)
23/08/2016 - Response by Railfuture Cymru/Wales on the Wales and Border Franchise inquiry by the House of Commons (183kB)
02/08/2016 - Railfuture response to NIC EastWestRail consultation (343kB)
01/08/2016 - Railfuture response to West Coast franchise consultation (560kB)
03/06/2016 - Railfuture response to HoC Transport Committee Inquiry into Rail Franchisng (303kB)
23/05/2016 - Railfuture response to the Transport Committee's Parliamentary Inquiry into Passenger Experience (317kB)
29/04/2016 - Railfuture Cymru response to Flintshire County Council Local Development Plan Key Messages consultation (274kB)
22/03/2016 - Railfuture response to the DfT West Midlands Rail Franchise Consultation (358kB)
21/03/2016 - Railfuture response to DfT-TfL January 2016 consultation on L&SE Prospectus (197kB)
18/03/2016 - Railfuture Cymru response to Setting the Direction to Wales and Border Rail (347kB)
16/03/2016 - Railfuture response to TransWilts consultation on being designated Community Rail (254kB)
12/02/2016 - Railfuture response to TfL December 2015 consultation on new river crossings in E and SE London (11kB)
09/02/2016 - Railfuture response to the South Western Rail Franchise consultation (374kB)
04/02/2016 - Railfuture response to Gloucestershire Rail Study Report (195kB)
03/02/2016 - Railfuture online response to Gloucestershire Draft Rail Strategy (104kB)
29/01/2016 - Railfuture Cymru response to Rugby World Cup Transport Planning report (225kB)
26/01/2016 - Railfuture response to West of England Joint Transport Study (287kB)
23/01/2016 - Railfuture response to TravelWest's Henbury station location consultation (150kB)
15/01/2016 - Railfuture response to the Rail Regulation consultation issued in December 2015 (220kB)
12/01/2016 - Railfuture Cymru response to inquiry into the priorities for the future of Welsh rail infrastructure (255kB)
08/01/2016 - Railfuture response to consultation questions on 'Connecting Northern Cities' (219kB)
08/01/2016 - Railfuture response to consultation questions on 'London's Transport Infrastructure' (241kB)
08/01/2016 - Railfuture response to TfL October 2015 consultation on Crossrail 2 (51kB)
24/12/2015 - Railfuture response to the scoping study for the 'Shaw report' (259kB)
20/12/2015 - Railfuture L&SE response to East Sussex CC Local Transport Implementation Plan 2016/17-20/21 (11kB)
23/10/2015 - Railfuture Response to DfT Consultation on CrossCountry Direct Award 2015 (396kB)
16/10/2015 - Railfuture Response to Competition and Markets Authority on Competition in Rail Services (210kB)
14/10/2015 - Railfuture response to East of Bath Park & Ride Proposals Consultation (197kB)
12/08/2015 - Railfuture response to Herts CC draft Rail Strategy (247kB)
31/07/2015 - Railfuture response to Travelwest consultation about Portishead line reopening (78kB)
21/06/2015 - Railfuture response to TfL May 2015 consultation on route options for Barking Riverside extension (10kB)
03/06/2015 - Railfuture response to Welsh Route Study (253kB)
28/04/2015 - Railfuture response to East Midlands Route Study (320kB)
13/03/2015 - Response to DfT Rail Executive Consultation on East Anglia Franchise (465kB)
28/02/2015 - Railfuture response to Network Rail Improving Connectivity consultation (137kB)
27/02/2015 - Railfuture Wales response to Welsh Government consultation on draft National Transport Plan 2015 (331kB)
15/02/2015 - Railfuture response to Network Rail's Wessex Route Study (318kB)
02/02/2015 - Railfuture response to Network Rail's Anglia Route Study (318kB)
29/01/2015 - Railfuture response to GTR's December 2015 timetable consultation (326kB)
15/01/2015 - Railfuture response to C2C Timetable Consultation (222kB)
12/01/2015 - Railfuture response to Network Rail's Sussex Route Study (320kB)
08/01/2015 - Railfuture response to Network Rail's Western Route Study (314kB)
04/12/2014 - Railfuture response to Bakerloo Line Extension consultation (180kB)
06/11/2014 - Railfuture response to Chiltern September 2015 timetable consultation (118kB)
18/08/2014 - Railfuture response to the Northern TransPennine franchise consultation (313kB)
25/06/2014 - Railfuture response to the GW franchise consultation (488kB)
12/05/2014 - Inquiry into Tourism - Railfuture Wales Consultation Response (329kB)
17/02/2014 - Railfuture Response to the Consultation on the draft National Networks National Policy Statement (457kB)
05/02/2014 - Southeastern December 2014 Timetable Consultation (260kB)
30/01/2014 - Railfuture response to NR on the Draft CP5 Delivery Plan (143kB)
29/01/2014 - Railfuture Response to HS2 Phase 2 Route Consultation (491kB)
20/01/2014 - Railfuture response to West Somerset Railway PLC Draft Corporate Plan Draft Corporate Plan 2014-2023 (84kB)
04/11/2013 - Consultation on contractual provisions to implement options for the capacity charge in CP5 (131kB)
18/10/2013 - Railfuture response to "A Long Term Rail Strategy for the North of England" consultation (289kB)
04/10/2013 - East Sussex County Council Draft Rail Strategy Consultation (261kB)
04/09/2013 - Comments on PR13 Draft determination of NR.s outputs and funding for 2014-19 (219kB)
04/09/2013 - Periodic Review 2013 Consultation on implementing PR13 (71kB)
09/08/2013 - Railfuture response to ORR on Periodic Review 2013 - On-rail competition: Consultation on options for change in open access (128kB)
29/07/2013 - Railfuture response to consultation by ORR on duty to cooperate (186kB)
24/07/2013 - Railfuture submission to NR LTPP - London and South East Market Study (133kB)
24/07/2013 - Railfuture submission to NR LTPP - Regional Urban Market Study (131kB)
23/07/2013 - Railfuture submission to NR LTPP - Freight Market Study (146kB)
16/07/2013 - Railfuture Submission to Aviation Commission on Long-Term Capacity Options (379kB)
11/07/2013 - Railfuture submission on HS2 Phase 1 Draft Environmental Statement (197kB)
27/06/2013 - Railfuture response to consultation on Surrey Rail Strategy (167kB)
26/06/2013 - Railfuture submission to NR LTPP - Long Distance Market Study (134kB)
15/04/2013 - Railfuture's submission to ORR's 2014 High Speed 1 Periodic Review (120kB)
19/03/2013 - Response to strategic road network/delivery of sustainable development consultation (395kB)
16/03/2013 - Railfuture response to ORR on Periodic Review 2013: consultation on a freight specific charge for biomass (203kB)
05/03/2013 - Railfuture response to Consultation on Integrated Transport Block Funding (155kB)
01/03/2013 - Railfuture response to consultation on Section 26(1) of the Railways Act 1993 (103kB)
18/02/2013 - Comments on Network Rail's Strategic Business Plan for CP5 (291kB)
25/01/2013 - Periodic Review 2013 - Consultation on Schedules 4 and 8 possessions and performance regimes (144kB)
19/01/2013 - Major Infrastructure Planning Reform - Amendments to Definitions for Highways and Rail Nationally Significant Schemes in Planning Act 2008 (109kB)
12/01/2013 - Railfuture East Anglia response to EDF Sizewell C, stage 1 (546kB)
04/12/2012 - Submission to the DfT about "Channel Tunnel: Transposition of Railway Safety and Interoperability Directives" (109kB)
27/11/2012 - Railfuture submission to Brown Review of Franchising (419kB)
26/11/2012 - Railfuture response to NR Property Consultation (121kB)
21/11/2012 - Railfuture's Response to the NR Consultation on Alternative Solutions Nov 2012 (406kB)
12/11/2012 - Railfuture Response to the DfT Bus Subsidy Consultation (240kB)
30/10/2012 - Railfuture response to DfT Consultation on Draft Aviation Policy Framework (193kB)
20/10/2012 - Railfuture's response to ORR Consultation on the ROGS (Miscellaneous Amendments) Regulations (204kB)
18/10/2012 - Railfuture's response to ORR's approach to transparency - a consultation (259kB)
27/09/2012 - Railfuture's response to the ORR Consultation on Network Rail's output framework for 2014-19 (218kB)
26/09/2012 - Railfuture's response to the ORR Consultation on financial issues for Network Rail in CP5 (206kB)
18/09/2012 - Railfuture response to DfT Consultation on the new Inter City East Coast franchise (273kB)
13/09/2012 - Railfuture's response to the DfT consultation on the new Combined Thameslink franchise (241kB)
12/09/2012 - Railfuture response to DfT on proposals for new South Eastern Franchise (197kB)
12/09/2012 - Railfuture's response to the DfT Consultation on the Proposed Abolition of the Disabled Persons Transport Advisory Committee (DPTAC) (204kB)
04/09/2012 - Railfuture response to ERA Consultation on draft of revised TSI on Locomotives and Passenger rolling stock on EU railways (conventional and HSR) (115kB)
28/08/2012 - Railfuture response to consultation by CrossCountry about December 2012 timetable proposals (124kB)
12/08/2012 - Railfuture Wales response to Welsh Government Consultation on the Active Travel (Wales) Bill (220kB)
08/08/2012 - Railfuture response to DfT on West London service closure proposals (199kB)
07/08/2012 - Railfuture response to the ORR Consultation Variable Usage Charge and on a Freight Specific Charge (219kB)
28/06/2012 - Railfuture response on Fares and Ticketing (313kB)
26/06/2012 - Railfuture response on Rail Decentralisation consultation (222kB)
25/06/2012 - Railfuture response to the DfT Consultation on the abolition of BR (Residuary) Ltd. (280kB)
14/06/2012 - Railfuture response to Chiltern Railways December 2012 Timetable consultation (191kB)
29/05/2012 - Railfuture response to the DfT on the HS2 Draft Environmental Impact Scoping Document (129kB)
10/05/2012 - Railfuture Response to the Essex Thameside Franchise Consultation (124kB)
16/04/2012 - Railfuture Evidence to TSC on Reforming our Railways (236kB)
16/04/2012 - Railfuture Response to Nettwork Rail RUS on Alternative Solutions (123kB)
10/04/2012 - Railfuture Response to HoC Welsh Affairs Committee on Cross Border Connectivity (230kB)
09/04/2012 - Railfuture Response to ORR on Network Rail's Long Term Planning Process (202kB)
06/04/2012 - Railfuture Scotland Response to Rail 2014 (162kB)
30/03/2012 - Railfuture Response to DfT on Devolving Local Major Transport Schemes (108kB)
26/03/2012 - Railfuture response to DfT Great Western franchise consultation (383kB)
30/01/2012 - Railfuture response to DfT on The A14 Challenge (144kB)
15/01/2012 - Railfuture response to Network Rail on Initial Industry Plan (IIP) (343kB)
18/11/2011 - Railfuture response to ORR on Network Rail's Initial Industry Plan (IIP) (284kB)
01/08/2011 - Railfuture response to Network Rail's draft Network RUS - Rolling Stock (125kB)
26/07/2011 - Railfuture Full Response to the DfT Consultation on HS2 (355kB)
08/07/2011 - Railfuture response to Network Rail's draft Network RUS - Stations (140kB)
10/06/2011 - Railfuture response to Network Rail's West Midlands & Chilterns RUS (393kB)
06/05/2011 - Railfuture evidence to House of Commons Transport Committee - High Speed Rail (289kB)
03/05/2011 - Railfuture response to London TravelWatch on Chiltern services (142kB)
17/04/2011 - Railfuture response to DfT on future of the WCML franchise (296kB)
18/03/2011 - Railfuture L&SE response to Network Rail's London and South East 2nd Generation RUS (736kB)
02/03/2011 - Railfuture response to Network Rail's West Coast Main Line RUS (202kB)
12/01/2011 - Railfuture response to Network Rail's Northern RUS (132kB)
12/01/2011 - Railfuture Scotland response to Network Rail's Scotland RUS (255kB)
02/11/2010 - Railfuture response to NR East Coast Main Line 2016 Capacity Review (105kB)
14/10/2010 - Railfuture response to 'Reforming Rail Franchising' review (122kB)
31/08/2010 - Britain's Railways - Much More for Much Less - Unsolicited submission by Railfuture to government departments prior to Comprehensive Spending Review announcement (74kB)
30/09/2008 - Railfuture response to ORR for the "North London Railway Track Access Option application" (124kB)
30/06/2004 - Railfuture response to Strategic Rail Authority's cycling and trains consultation (200kB)
Many of these documents will use the old company name (Railway Development Society Ltd). Since 1st January 2018 we have been Railfuture Ltd.
CAUTION: Older documents may no longer reflect Railfuture's current policies. Contact details may also be out of date: please always get latest details from www.railfuture.org.uk/Contact+Us.
Click on one of the document files shown above or click [IMAGES] to view other types of files
Support Our National Campaigning - Join Railfuture
Annual Rates: £20 individuals, £22 joint, £14 under 26 |
|