Railfuture has 12 branches in England plus Wales and Scotland which are involved in local issues and come together to support Railfuture on national campaigns.
To see a 'dashboard' summary of information about the branch (generic contact details, list of newsletters, branch pages and more) click on one of the maps above or the branch area on the map below. Click LIBRARY to see a list of information available nationally and for every branch (includes many hundreds of files to download).
Please click on the branch name below to find individual contacts plus campaign information for your local group. Click on the corresponding Twitter icon to see their tweets.
Devon and Cornwall
East Anglia
East Midlands
Lincolnshire
London and South East
North East
North West
Severnside
Thames Valley
Wessex
West Midlands
Yorkshire
Railfuture Scotland
Railfuture Cymru/Wales
Click NEWSLETTERS for links to the latest newsletter for each branch and TWITTER to see a list of all Railfuture Twitter accounts showing the number of tweets and followers including date of last tweet.
For Railfuture branch contact details across Britain please see Who's Who (PDF). Please do not send direct messages to Twitter accounts for important requests as they are not all monitored frequently.
Dashboard for London and South East
Contact by e-mail: londonandsoutheast at railfuture.org.uk
X/Twitter account: @RailfutureLSE
Twitter campaigns: Railfuture Great Northern Inners, Uckfield-Lewes
Facebook page: RfSussex
Branch information: click MAIN PAGE for the main page containing branch activities and campaigns
If your browser is not configured to view a file then click the 'file size' to download it.
Branch eBulletins
- inter-railse issue 76 - October 2024 (256kB)
- inter-railse issue 75 - September 2024 (304kB)
- inter-railse issue 74 - August 2024 (390kB)
- inter-railse issue 73 - July 2024 (537kB)
- inter-railse issue 72 - June 2024 (614kB)
- inter-railse issue 71 - May 2024 (747kB)
- inter-railse issue 70 - April 2024 (874kB)
- inter-railse issue 69 - March 2024 (445kB)
- inter-railse issue 68 - February 2024 (270kB)
- inter-railse issue 67 - January 2024 (543kB)
- inter-railse issue 66 - December 2023 (391kB)
- inter-railse issue 65 - November 2023 (286kB)
- inter-railse issue 64 - October 2023 (257kB)
- inter-railse issue 63 - September 2023 (266kB)
- inter-railse issue 62 - August 2023 (372kB)
- inter-railse issue 61 - July 2023 (461kB)
- inter-railse issue 60 - June 2023 (235kB)
- inter-railse issue 59 - May 2023 (337kB)
- inter-railse issue 58 - April 2023 (386kB)
- inter-railse issue 57 - March 2023 (310kB)
- inter-railse issue 56 - February 2023 (435kB)
- inter-railse issue 55 - January 2023 (366kB)
- inter-railse issue 54 - December 2022 (397kB)
- inter-railse issue 53 - November 2022 (266kB)
- inter-railse issue 52 - October 2022 (420kB)
- inter-railse issue 51 - September 2022 (333kB)
- inter-railse issue 50 - August 2022 (557kB)
- inter-railse issue 49 - July 2022 (425kB)
- inter-railse issue 48 - June 2022 (272kB)
- inter-railse issue 47 - May 2022 (230kB)
- inter-railse issue 46 - April 2022 (315kB)
- inter-railse issue 45 - March 2022 (282kB)
- inter-railse issue 44 - February 2022 (334kB)
- inter-railse issue 43 - January 2022 (332kB)
- inter-railse issue 42 - December 2021 (290kB)
- inter-railse issue 41 - November 2021 (289kB)
- inter-railse issue 40 - October 2021 (237kB)
- inter-railse issue 39 - September 2021 (390kB)
- inter-railse issue 38 - August 2021 (545kB)
- inter-railse issue 37 - July 2021 (403kB)
- inter-railse issue 36 - June 2021 (292kB)
- inter-railse issue 35 - May 2021 (283kB)
- inter-railse issue 34 - April 2021 (246kB)
- inter-railse issue 33 - March 2021 (329kB)
- inter-railse issue 32 - February 2021 (403kB)
- inter-railse issue 31 - January 2021 (328kB)
- inter-railse issue 30 - December 2020 (310kB)
- inter-railse issue 29 - November 2020 (396kB)
- inter-railse issue 28 - October 2020 (323kB)
- inter-railse issue 27 - September 2020 (288kB)
- inter-railse issue 26 - August 2020 (247kB)
- inter-railse issue 25 - July 2020 (438kB)
- inter-railse issue 24 - June 2020 (423kB)
- inter-railse issue 23 - May 2020 (484kB)
- inter-railse issue 22 - April 2020 (534kB)
- inter-railse issue 21 - March 2020 (280kB)
- inter-railse issue 20 - February 2020 (263kB)
- inter-railse issue 19 - January 2020 (294kB)
- inter-railse issue 18 - December 2019 (348kB)
- inter-railse issue 17 - November 2019 (330kB)
- inter-railse issue 16 - October 2019 (308kB)
- inter-railse issue 15 - September 2019 (361kB)
- inter-railse issue 14 - August 2019 (329kB)
- inter-railse issue 13 - July 2019 (379kB)
- inter-railse issue 12 - June 2019 (277kB)
- inter-railse issue 11 - May 2019 (238kB)
- inter-railse issue 10 - April 2019 (334kB)
- inter-railse issue 09 - March 2019 (255kB)
- inter-railse issue 08 - February 2019 (239kB)
- inter-railse issue 07 - January 2019 (233kB)
- inter-railse issue 06 - December 2018 (278kB)
- inter-railse issue 05 - November 2018 (326kB)
- inter-railse issue 04 - October 2018 (272kB)
- inter-railse issue 03 - September 2018 (213kB)
- inter-railse issue 02 - August 2018 (254kB)
- inter-railse issue 01 - July 2018 (189kB)
Magazines and Newsletters
- railse 165 - September 2024 (1.1MB)
- railse 164 - June 2024 (1.2MB)
- railse 163 - March 2024 (3.6MB)
- railse 162 - December 2023 (5.0MB)
- railse 161 - September 2023 (1.3MB)
- railse 160 - June 2023 (921kB)
- railse 159 - March 2023 (1.3MB)
- railse 158 - December 2022 (1.1MB)
- railse 157 - September 2022 (1.3MB)
- railse 156 - June 2022 (1.1MB)
- railse 155 - March 2022 (1.2MB)
- railse 154 - December 2021 (1.7MB)
- railse 153 - September 2021 (1.8MB)
- railse 152 - June 2021 (1.5MB)
- railse 151 - March 2021 (1.7MB)
- railse 150 - December 2020 (1.5MB)
- railse 149 - September 2020 (1.6MB)
- railse 148 - June 2020 (1.6MB)
- railse 147 - March 2020 (1.5MB)
- railse 146 - December 2019 (1.2MB)
- railse 145 - September 2019 (1.1MB)
- railse 144 - June 2019 (1.0MB)
- railse 143 - March 2019 (1.2MB)
- railse 142 - December 2018 (1.2MB)
- railse 141 - September 2018 (1.0MB)
- railse 140 - June 2018 (811kB)
- railse 139 - March 2018 (814kB)
- railse 138 - December 2017 (1.2MB)
- railse 137 - September 2017 (1.2MB)
- railse 136 - June 2017 (1.1MB)
- railse 135 - March 2017 (1.0MB)
- railse 134 - December 2016 (724kB)
- railse 133 - September 2016 (829kB)
- railse 132 - June 2016 (1.0MB)
- railse 131 - March 2016 (838kB)
- railse 130 - December 2015 (782kB)
- railse 129 - September 2015 (956kB)
- railse 128 - June 2015 (675kB)
- railse 127 - March 2015 (732kB)
- railse 126 - December 2014 (695kB)
- railse 125 - September 2014 (711kB)
- railse 124 - June 2014 (580kB)
- railse 123 - March 2014 (626kB)
- railse 122 - December 2013 (530kB)
- railse 121 - September 2013 (783kB)
- railse 120 - June 2013 (211kB)
- railse 119 - March 2013 (497kB)
- railse 118 - December 2012 (235kB)
- railse 117 - September 2012 (1.6MB)
- railse 116 - June 2012 (107kB)
- railse 115 - March 2012 (213kB)
- railse 114 - December 2011 (633kB)
- railse 113 - September 2011 (283kB)
- railse 112 - June 2011 (218kB)
- railse 111 - March 2011 (165kB)
- railse 110 - December 2010 (130kB)
- railse 109 - October 2010 (189kB)
- railse 108 - July 2010 (215kB)
Miscellaneous Documents and Audio
- 30/03/2021 - Surrey CC New Rail Strategy (4.4MB)
- 05/10/2020 - Lindfield Life Nov '16 article on Rev. Michael Davies (321kB)
- 21/05/2020 - Modern Railways June letter on success of GTR/Southern May 2018 timetable's 'Eastbourne overlap' (1.6MB)
- 19/12/2018 - article in RAIL on 'Treegate' (1.0MB)
- 02/03/2018 - Bexhill Observer article on GTR/Southern May 2018 timetable (1.2MB)
- 02/03/2018 - Hastings Observer article on GTR/Southern May 2018 timetable (2.7MB)
- 27/07/2017 - Modern Railways August 2017 article on GTR May 2018 Southern timetable includes Railfuture proposal (436kB)
Annual General Meetings
- L&SE branch meeting 2021 (146kB)
- L&SE Branch AGM 2024 (1.0MB)
- L&SE Branch AGM 2023 (718kB)
- L&SE Branch AGM 2022 (518kB)
- L&SE branch AGM 2021 (292kB)
- L&SE branch AGM 2019 (590kB)
- L&SE branch AGM 2018 - Minutes (138kB)
- L&SE branch AGM 2018 (437kB)
- L&SE branch AGM 2017 (908kB)
Articles by Railfuture in magazines
Campaigning Literature from Railfuture
- 08/05/2024 - Railfuture L&SE letter to re-elected Mayor of London (172kB)
- 08/03/2024 - London Mayoral Election 2024: ''A Rail Manifesto for London'' (216kB)
- 08/03/2024 - London Mayoral Election 2024: ''A Rail Manifesto for London'' - summary (197kB)
- 28/08/2023 - Briefing note sent to London Assembly Transport Committee on the demise of the London Travelcard (193kB)
- 21/10/2021 - Hoo Peninsula Railway - presentation to Gravesend Railway Enthusiasts Society (364kB)
- 14/04/2021 - London Mayoral Election 2021: "Our Manifesto for rail for the next London Mayoral term" (426kB)
- 07/03/2016 - London Mayoral Election 2016: "Rail Manifesto for London" (458kB)
- Marshlink "High Speed Hastings" 2015 leaflet promoting faster link to London (495kB)
- Railfuture "Electrify Uckfield!" 2017 leaflet (323kB)
- Railfuture "LUcky Garden Village" 2019 leaflet (388kB)
- Uckfield Traffic Improvements - ESCC exhibition 2013 (618kB)
- Uckfield-Lewes - 2022 is reopening target (Dec 2013 article) (6.4MB)
- Uckfield-Lewes "Bridge the Gap" 2012 leaflet - Link up Sussex (1.8MB)
- Uckfield-Lewes "Bridge the Gap" 2013 leaflet - Connect East Sussex (centre-fold) (318kB)
- Uckfield-Lewes "Bridge the Gap" 2015 leaflet - two complementary projects (675kB)
- Uckfield-Lewes "Bridge the Gap" 2017 leaflet (981kB)
- Uckfield-Lewes banner - incremental approach (427kB)
- Uckfield-Lewes banners (1.1MB)
Community Rail Partnerships
- 06/10/2017 - Community Rail Awards 2017 winner in L&SE - Kent (387kB)
- 06/10/2017 - Community Rail Awards 2017 winner in L&SE - West Anglia (382kB)
Discussion Papers
- 27/01/2010 - Presentation on Chingford to Stratford line for Waltham Forest Council (591kB)
- 20/05/2009 - Report on Case For A Chingford To Stratford Rail Service (86kB)
- Report on Reopening Lea Bridge station for Waltham Forest Council in 2012 (4.9MB)
Elections to the Railfuture Branch Committees
- 10/12/2016 - London & SE branch committee nomination form (420kB)
- 18/12/2015 - London & South East Branch Committee Nomination Forms (65kB)
Fliers and posters for Conferences and Public Meetings
Governance
Lobbying to Governments and Train Operators by Railfuture
- GN Inners - Railfuture on Passenger & Taxpayer needs - September 2020 (295kB)
- Thameslink and Great Northern - Sample member letter to an MP on Carnets to be on the Key PDQ (181kB)
London and South East
London Metro
- 15/08/2024 - London Metro Newsletter August 2024 (342kB)
- 18/07/2024 - TfL presentation to London Metro Division meeting (5.6MB)
- 16/07/2024 - London Metro Meeting 18 July 2024 Agenda (62kB)
- 05/06/2024 - London Metro Newsletter June 2024 (455kB)
- 16/05/2024 - London Metro Division Minutes (147kB)
- 29/12/2023 - Invite to Metro Meeting on 17 Jan 2024 (820kB)
Non-Railfuture Publications and Leaflets
- 18/07/2023 - Rail Business Daily article on triple award-winning Friends of Bishopstone Station (170kB)
- 17/07/2023 - Sussex World article on triple award-winning Friends of Bishopstone Station (274kB)
- 05/07/2016 - Lea Bridge station - "New east-London hot spot" - Metro Property (973kB)
- 29/01/2013 - Lea Bridge station to open - Waltham Forest News (564kB)
- 12/03/2012 - MarshLink is open! - Sussex CRP walks from stations (1.8MB)
- East London Line Group 1990-2010 - An Enduring Legacy (1.4MB)
- The SoLLTA Story - 1987-97 (5.3MB)
Networks (Railway, Metro and Tram) and Services
Press releases
- 11/07/2014 - North to get modern Southern diesels from Electrification infills (11kB)
- 04/05/2014 - Happy 20th birthday Channel Tunnel (70kB)
- 21/02/2014 - For HS2 demolish Euston Station and then go further (63kB)
- 06/12/2013 - Cautious welcome to Uckfield-Lewes news (131kB)
- 05/09/2013 - Good news on Lewes-Uckfield rail scheme (59kB)
- 14/06/2013 - East West Rail Rally (Press Release for Bedfordshire) (130kB)
- 11/03/2013 - Railfuture commissions JR Consulting to study Uckfield-Lewes rail reopening (241kB)
- 14/12/2011 - Railfuture welcomes Croxley Link go-ahead (45kB)
- 09/07/2011 - Railfuture High-Speed Conference finds Common Ground (78kB)
- 10/11/2010 - National rail conference comes to Shoreditch (39kB)
- 15/11/2008 - Railfuture's 'Railways in the future' London conference sells out (40kB)
- 05/08/2008 - Rail campaigners cheer new Eurostar service for Ashford (41kB)
Presentations from Conferences and Public Meetings
- 20/04/2024 - Rail Partners - Andy Bagnall presentation to branch AGM 2024 (531kB)
- 20/04/2024 - Otterpool Park - Stephen Gasche presentation to branch AGM 2024 (3.9MB)
- 15/07/2023 - Presentation by Friends of Bishopstone Station Chair Barbara Mine on her Award and their two Commendations (847kB)
- 22/04/2023 - TfSE presentation to L&SE Branch annual meeting: "Strategic transport investment - TfSE's 30-year plan and the role for rail." (3.6MB)
- 09/08/2022 - Railfuture L&SE presentation to Lewes Town Council Planning Committee on 'Bridge the gap' for Lewes-Uckfield (764kB)
- 30/04/2022 - RSSB presentation to L&SE Branch annual meeting: "Towards step free journeys." (3.7MB)
- 02/09/2021 - Network Rail presentation on Kent & East Sussex Coastal Connectivity Programme SOBC - updated August 21 (367kB)
- 08/07/2021 - Surrey CC presentation to SCRP North Downs Line AGM on new county rail strategy (1.1MB)
- 15/05/2021 - Expedition Engineering presentation on proposed Ashford-Reading direct rail via Gatwick (12MB)
- 11/12/2020 - Network Rail presentation on Kent & East Sussex Coastal Connectivity (1.1MB)
- 27/10/2020 - Presentation by Luton Borough Council on draft Local Transport Plan 4 (837kB)
- 21/10/2020 - TfSE Area Studies - Outer Orbital Forum 1 (3.2MB)
- 14/10/2020 - Presentation on South Kensington Underground station (9.5MB)
- 13/10/2020 - Presentation to Kent Rail Summit - Southeastern (2.3MB)
- 13/10/2020 - Presentation to Kent Rail Summit - Network Rail (1.5MB)
- 13/10/2020 - Presentation to Kent Rail Summit - Kent Rail Strategy 2021 (2.0MB)
- 01/10/2020 - Presentation by NR on West Sussex Connectivity Modular Strategic Study (3.3MB)
- 23/07/2020 - Presentation by TfSE on final Transport Strategy 2050 (1.4MB)
- 21/07/2020 - Introduction by Network Rail to 1st N. & E. Kent Connectivity CMSP workshop (117kB)
- 23/04/2020 - TfSE Area Studies - South East Radial area (1.6MB)
- 23/04/2020 - TfSE Area Studies - South Central Radial area (1.5MB)
- 23/04/2020 - TfSE Area Studies - Outer Orbital area (1.5MB)
- 23/04/2020 - TfSE Area Studies - Inner Orbital area (1.0MB)
- 19/03/2020 - Medway: Planning for growth on the Hoo Peninsula (8.0MB)
- 06/02/2020 - Presentation by Network Rail on West Coastway CMSP (2.2MB)
- 09/01/2020 - Presentation by GTR on May 2020 timetable (2.0MB)
- 07/11/2019 - Presentation by Network Rail on Gatwick Airport station upgrade (963kB)
- 07/10/2019 - TfSE Sustainable Route to Growth infographic (160kB)
- 03/10/2019 - Presentation by Network Rail on West Coastway CMSP (2.1MB)
- 19/08/2019 - Presentation by Network Rail to 2nd W. Sussex CMSP workshop - notes (177kB)
- 19/08/2019 - Presentation by Network Rail to 2nd W. Sussex CMSP workshop (2.8MB)
- 19/07/2019 - TfSE Trans Strat Wkg Grp - Thematic studies (9MB)
- 19/07/2019 - TfSE Trans Strat Wkg Grp - notes (96kB)
- 19/07/2019 - TfSE Trans Strat Wkg Grp (921kB)
- 18/07/2019 - Presentation by TfSE on draft Transport Strategy 2050 (2.8MB)
- 01/05/2019 - TfSE Trans Strat Wkg Grp notes (104kB)
- 01/05/2019 - TfSE Trans Strat Wkg Grp - Mobility (2.9MB)
- 01/05/2019 - TfSE Trans Strat Wkg Grp (1.8MB)
- 27/04/2019 - Presentation by TfL on Airport Surface Access to L&SE branch AGM 2019 (4.2MB)
- 27/04/2019 - Presentation by Heathrow Southern Railway to L&SE branch AGM 2019 (15MB)
- 04/04/2019 - Presentation by WSCC on How to improve West Coastway rail services (561kB)
- 04/04/2019 - Presentation by SCATE on How to improve West Coastway rail services (2.2MB)
- 04/04/2019 - Presentation by Network Rail on How to improve West Coastway rail services (6.1MB)
- 07/02/2019 - Presentation on ''A rail future for Tunbridge Wells'' (572kB)
- 07/02/2019 - Presentation by Network Rail on CMSP (912kB)
- 07/02/2019 - Presentation by Network Rail on BML Improvement Project (4.9MB)
- 28/01/2019 - Presentation by Network Rail to 1st W. Sussex CMSP workshop (8.5MB)
- 09/01/2019 - TfSE Trans Strat Wkg Grp notes (226kB)
- 09/01/2019 - TfSE Trans Strat Wkg Grp intro (1.2MB)
- 09/01/2019 - TfSE Trans Strat Wkg Grp (1.5MB)
- 27/11/2018 - Presentation by Network Rail on BML Improvement Project, CARS, Reigate, North Downs Line (1.9MB)
- 19/07/2018 - Presentation by Transport Focus on Fares & Ticketing (488kB)
- 19/07/2018 - Presentation by Rail Delivery Group on Fares & Ticketing (2.3MB)
- 07/06/2018 - Presentation by GTR on Accessibility (1.6MB)
- 07/06/2018 - Presentation by Brighton & Hove Buses on Accessibility (3.8MB)
- 28/04/2018 - Presentation on KenEx Thames Transit to London & South East branch AGM 2018 (2.0MB)
- 28/04/2018 - Presentation by UK Tram to 2018 London & South East branch AGM (4.4MB)
- 19/04/2018 - Railfuture L&SE presentation to Lewes District Council Scrutiny Committee on 'Bridge the gap' for Lewes-Uckfield (279kB)
- 27/02/2018 - Presentation by GTR on May 2018 timetable to MLAG AGM, Rye (1.3MB)
- 17/02/2018 - Presentation to Kent Division (916kB)
- 06/10/2017 - Presentation by Network Rail on MarshLink (447kB)
- 29/04/2017 - Presentation by Windsor Link Railway to 2017 AGM (3.0MB)
- 29/04/2017 - Presentation by Heathrow Southern Railway to 2017 AGM (6.5MB)
- 03/02/2015 - Presentation by Network Rail on MarshLink (666kB)
- 19/03/2014 - Presentation by Network Rail on MarshLink (1.7MB)
- 07/12/2013 - Presentation by Windsor Link Railway to Railfuture London & South East (3.9MB)
- 18/07/2013 - Presentation on JRC report - Access and Connections: East Sussex (816kB)
Radio Interviews
- 06/07/2023 - BBC Surrey Neil Middleton ticket office closures (939kB)
- 05/07/2023 - BBC Radio Kent Chris Fribbins ticket office closures (781kB)
- 23/05/2023 - BBC Sussex Chris Page on travelcard withdrawal (1.2MB)
- 15/05/2023 - BBC Essex BW one day travelcards (3.5MB)
- 22/09/2022 - BBC Radio Kent Chris Fribbins timetable changes (1.8MB)
- 06/09/2021 - BBC Surrey Stewart Palmer Chris Grayling Service Cuts (3.0MB)
- 24/11/2020 - BBC Essex Bruce Williamson on C2C service reductions (1.4MB)
- 31/07/2020 - BBC Radio Surrey interview with Railfuture and affiliated RUG about flexible tickets (2.3MB)
- 21/11/2019 - Roger Blake on BBC London about tube overcrowding (1.2MB)
- 07/08/2017 - Chris Page on BBC Surrey about Waterloo platform extension works (398kB)
- 23/09/2016 - Bruce Williamson on Talk Radio about more strikes on Southern Railway (3.3MB)
- 19/08/2016 - Bruce Williamson on LBC Radio about start of the Night Tube and other changes (2.9MB)
- 10/08/2016 - Bruce Williamson on BBC Radio London about Southern Railway strike over Driver Controlled Operation of trains (1.0MB)
- 28/07/2016 - Chris Fribbins on BBC Radio Kent about overcrowding on rail services south of London (1.3MB)
- 12/01/2015 - Chris Fribbins on BBC BBC Kent about London Bridge station works (2.2MB)
- 17/02/2014 - Chris Fribbins on BBC Radio Kent about 'Which?' report on SE Trains (1.4MB)
Reports of Conferences and Events
- 14/08/2019 - NR West Sussex Connectivity - CMSP newsletter (196kB)
- 03/06/2019 - NR West Sussex Connectivity - CMSP newsletter (600kB)
- 03/06/2019 - NR West Sussex Connectivity - Market Study (2.4MB)
- 21/10/2016 - MVA Chingford-Stratford Operational Feasibility Review (860kB)
- 19/06/2015 - NR Stratford-Orient Way capacity pre-GRIP feasibility (8.7MB)
- Arriva Rail London launch West Anglia CRP (114kB)
- Crossrail 2 Eastern extension (2.5MB)
- Southern Stakeholder Timetable Meeting April 2015 (105kB)
Railfuture Research, Investigations, Studies and Site Visits
- 01/12/2020 - East Coastway MarshLink station usage 2017-18 - 2019-20 (143kB)
- 01/12/2020 - East Coastway MarshLink station usage 2019-20 (132kB)
- 15/07/2013 - Access and Connections: East Sussex - report commissioned by Railfuture about East Sussex railways (6.2MB)
- Report commissioned by Railfuture about Lea Valley Rail "putting Waltham Forest into the equation" by JRC (2.0MB)
- Report commissioned by Railfuture about Lea Valley Rail by JRC (3.2MB)
- Report commissioned by Railfuture about reopening Lea Valley station by JRC (1.1MB)
Submissions
- 08/09/2024 - Railfuture L&SE response to Medway Council's pre-draft Local Plan 2041 (Regulation 18) - full (195kB)
- 08/09/2024 - Railfuture L&SE response to Medway Council's pre-draft Local Plan 2041 (Regulation 18) - summary (170kB)
- 29/06/2024 - Railfuture L&SE response to Central Bedfordshire initial engagement for draft Local Transport Plan (165kB)
- 02/06/2024 - Railfuture response to Transport for the South East survey for Transport Strategy refresh (336kB)
- 10/05/2024 - Railfuture L&SE response to Wealden DC on draft Local Plan (136kB)
- 18/03/2024 - Railfuture L&SE response to TfL on DLR extension to Thamesmead (164kB)
- 29/02/2024 - Railfuture response to England's Economic Heartland call for Evidence for Luton-Bedford-Corby Connectivity Study (136kB)
- 25/02/2024 - Railfuture L&SE response to East Sussex CC survey for draft Local Transport Plan 4, 2024-50 (148kB)
- 19/02/2024 - Railfuture L&SE response to draft Neighbourhood Plan for Hoo St. Werburgh & Chattenden, Medway (136kB)
- 19/02/2024 - Railfuture L&SE response to Lewes DC Spatial Strategy and Policy Directions for draft Local Plan (232kB)
- 29/12/2023 - Railfuture L&SE response to Lewes DC survey for Vision 2024-28 (159kB)
- 18/11/2023 - Railfuture L&SE representation to City of London Corporation on planning application for Liverpool Street station (124kB)
- 31/10/2023 - Railfuture L&SE response to "Setting the direction for Medway 2040" - Medway Local Plan 2040 (249kB)
- 27/09/2023 - Railfuture response to GTR/Southern West Coastway timetable proposals (95kB)
- 18/09/2023 - Railfuture L&SE response to Kent County Council's emerging Local Transport Plan 5, 2022-50 (245kB)
- 26/07/2023 - Railfuture submission to Transport Focus and London TravelWatch on GTR Ticket Offices (135kB)
- 11/05/2023 - Railfuture response to Transport for London's engagement on the future of the day Travelcard (246kB)
- 22/03/2023 - Railfuture L&SE submission to Planning Inspectorate on Lewes DC appeal 23/0004 in Ringmer, Lewes by Gleeson Land (131kB)
- 22/03/2023 - Railfuture L&SE submission to Planning Inspectorate on Lewes DC appeal 23/0005 in Ringmer, Lewes by Gleeson Land (131kB)
- 24/02/2023 - Railfuture response to APPG South East inquiry on the South East, transport infrastructure and 'Global Britain' (223kB)
- 20/01/2023 - Railfuture L&SE response to Eastbourne Growth Strategy for Local Plan (126kB)
- 09/12/2022 - Railfuture L&SE response to East Sussex CC Local Transport Plan 4, 2023-50 (362kB)
- 28/11/2022 - Railfuture L&SE response to Network Rail / MTR / Stellar on proposed Liverpool Street station upgrade (91kB)
- 25/11/2022 - Railfuture L&SE response to Medway Council's draft Hoo Development Framework (139kB)
- 23/09/2022 - Railfuture L&SE response to Bluebell Railway Western Extension Project (148kB)
- 15/09/2022 - Railfuture L&SE submission to Planning Inspectorate on Lewes DC appeal 22/0020 in Ringmer, Lewes by B.Ellis, A.&S.Cooper (129kB)
- 12/09/2022 - Railfuture response to TfSE draft Strategic Investment Plan (154kB)
- 01/09/2022 - Railfuture L&SE submission to Planning Inspectorate for South Kensington station appeal (80kB)
- 25/08/2022 - Railfuture L&SE objection to planning application LW/22/0472 in Ringmer, Lewes District (76kB)
- 27/07/2022 - Railfuture L&SE response to Gatwick Airport Ltd on Northern Runway project (126kB)
- 05/07/2022 - Railfuture L&SE submission to Planning Inspectorate on Lewes DC appeal 22/0017 in Ringmer, Lewes by Croudace Homes (138kB)
- 03/04/2022 - Railfuture response to Future LuToN Statutory Consultation (176kB)
- 25/03/2022 - Railfuture L&SE response to TfL's Surrey Quays station capacity and accessibility enhancements (77kB)
- 21/03/2022 - Railfuture L&SE objection to planning application LW/22/0104 in Ringmer, Lewes District (76kB)
- 10/02/2022 - Railfuture L&SE response to TfL Step Free Access Survey (386kB)
- 07/02/2022 - Railfuture L&SE objection to planning application LW/21/0937 in Ringmer, Lewes District (75kB)
- 07/02/2022 - Railfuture L&SE objection to planning application LW/21/0986 in Ringmer, Lewes District (75kB)
- 30/01/2022 - Railfuture response to Transport East draft Transport Strategy (159kB)
- 27/01/2022 - Railfuture response to Herts CC's "HERT" - Herts-Essex Rapid Transit (393kB)
- 14/01/2022 - Railfuture L&SE response to Ebbsfleet Development Corporation on Ebbsfleet Central East (167kB)
- 12/01/2022 - Railfuture L&SE response to the APPG for South East inquiry on Levelling-up (266kB)
- 10/01/2022 - Railfuture L&SE response to Medway Council second 'Future Hoo' consultation (178kB)
- 01/12/2021 - Railfuture L&SE response to Gatwick Airport Ltd pre-DCO proposals for Northern Runway (191kB)
- 15/11/2021 - Railfuture L&SE response to Brighton & Hove draft Local Transport Plan 5 (275kB)
- 03/11/2021 - Railfuture L&SE response to Croudace Homes - new homes and community facilities for Ringmer, Lewes - 2 (92kB)
- 24/10/2021 - Railfuture L&SE response to Surrey CC's draft Transport Plan 2022-32, LTP4 (155kB)
- 22/10/2021 - Railfuture L&SE follow-up to London Assembly Transport Committee 12 October 2021 (243kB)
- 15/10/2021 - Railfuture L&SE response to East Sussex CC survey for A259 South Coast Corridor Improvement Study (Rottingdean-Pevensey) (89kB)
- 12/10/2021 - Railfuture response to MHCLG / DLUHC Oxford-Cambridge Arc Spatial Framework priorities (117kB)
- 08/10/2021 - Railfuture L&SE response to draft West Sussex Transport Plan 2022-36 (94kB)
- 13/09/2021 - Railfuture supplementary response to South Western Railway timetable for December 2022 (305kB)
- 03/09/2021 - Railfuture L&SE response to C2E Partnership's Improving Transport Links between Abbey Wood and Ebbsfleet - 2 (205kB)
- 03/09/2021 - Railfuture L&SE response to Lewes DC Local Plan - Issues And Options (381kB)
- 27/08/2021 - Railfuture L&SE response to Croudace Homes - new community facilities in Ringmer, Lewes - 1 (81kB)
- 27/08/2021 - Railfuture response to TfSE Stakeholder Survey on its current and future role (151kB)
- 26/08/2021 - Railfuture response to South Western Railway timetable for December 2022 (145kB)
- 07/07/2021 - Railfuture L&SE objection to planning application LW/21/0302 in Ringmer, Lewes District (77kB)
- 30/06/2021 - Railfuture response to England's Economic Heartland call for evidence: Oxford-Milton Keynes Connectivity Study (96kB)
- 09/06/2021 - Railfuture response to East West Rail Co 2nd non-statutory consultation (400kB)
- 04/06/2021 - Railfuture L&SE response to Tunbridge Wells Pre-Submission Local Plan (78kB)
- 06/04/2021 - Railfuture L&SE response to Medway Future Hoo, New Routes to Good Growth (166kB)
- 31/03/2021 - Railfuture L&SE representation to Planning Inspectorate on DCO application for London Resort (156kB)
- 26/03/2021 - Railfuture L&SE supplementary submission to RB Kensington & Chelsea on S. Kensington station (131kB)
- 24/03/2021 - Railfuture L&SE response to Hastings draft Local Plan (104kB)
- 03/03/2021 - Railfuture L&SE response to C2E Partnership on Improving links between Abbey Wood and Ebbsfleet - 1 (178kB)
- 28/02/2021 - Railfuture Wessex / London & SE joint response to Hampshire CC survey for LTP4 (145kB)
- 18/02/2021 - Railfuture L&SE submission to RB Kensington & Chelsea on S. Kensington station (128kB)
- 08/02/2021 - Railfuture East Anglia response to Greater Anglia on December '21 GEML timetable (250kB)
- 18/01/2021 - Railfuture L&SE response to Wealden Local Plan Direction of Travel (191kB)
- 17/12/2020 - Railfuture L&SE response to West Sussex CC Transport Plan Review survey (104kB)
- 11/12/2020 - Railfuture L&SE response to East Sussex CC on first LCWIP (78kB)
- 01/12/2020 - Railfuture L&SE response to Homes England on West of Ifield, W. Sussex (88kB)
- 17/11/2020 - Railfuture L&SE response to Kent Rail Strategy 2021 (325kB)
- 15/11/2020 - Railfuture L&SE response to Luton BC draft Local Transport Plan (175kB)
- 14/10/2020 - Railfuture L&SE response to Surrey Rail Strategy survey (290kB)
- 06/10/2020 - Railfuture response to England's Economic Heartland draft Transport Strategy (227kB)
- 21/09/2020 - Railfuture L&SE response to London Resort pre-DCO (185kB)
- 20/09/2020 - Railfuture L&SE response to Network Rail Croydon Area Remodelling Scheme - 2 (117kB)
- 11/05/2020 - Railfuture L&SE response to Medway Council on Hoo Peninsula growth (190kB)
- 19/04/2020 - Railfuture L&SE response to DfT on Newhaven Marine station closure (80kB)
- 06/04/2020 - Railfuture L&SE response to Network Rail on Reigate station upgrade (112kB)
- 30/03/2020 - Railfuture L&SE response to Hertfordshire CC draft Rail Strategy (433kB)
- 23/03/2020 - Railfuture L&SE response to 'Future Mole Valley' (294kB)
- 07/02/2020 - Railfuture response to EMR Dec '20 timetable (863kB)
- 10/01/2020 - Railfuture L&SE response to Eastbourne BC Local Plan issues & options (145kB)
- 10/01/2020 - Railfuture response to TfSE draft Transport Strategy (210kB)
- 22/12/2019 - Railfuture L&SE response to Bakerloo Line Extension consultation-3 (26kB)
- 21/12/2019 - Railfuture response on SWR proposals for Dec '20 timetable (28kB)
- 31/10/2019 - Railfuture L&SE response to C2C LEP's Local Industrial Strategy (279kB)
- 31/10/2019 - Railfuture response to England's Economic Heartland Outline Transport Strategy (207kB)
- 31/07/2019 - Railfuture response to TfSE draft statutory body proposal (166kB)
- 26/07/2019 - Railfuture L&SE response to Network Rail on Norwood Junction (6kB)
- 05/07/2019 - Railfuture L&SE response to SE LEP Coastal Communities Economic Prospectus (126kB)
- 11/03/2019 - Railfuture response to East West Rail Co central section Route Options (139kB)
- 10/03/2019 - Railfuture L&SE response to LBBD Barking station (77kB)
- 13/01/2019 - Railfuture L&SE response to City of London draft Transport Strategy (114kB)
- 10/01/2019 - Railfuture L&SE response to Gatwick Airport draft Master Plan (98kB)
- 06/01/2019 - Railfuture L&SE response to TfL Sutton Link (90kB)
- 17/12/2018 - Railfuture L&SE response to Network Rail Croydon Area Remodelling Scheme - 1 (80kB)
- 16/11/2018 - Railfuture L&SE response to DfT Angel Road station closure (28kB)
- 12/10/2018 - Railfuture L&SE response to LTW Overground ticket office closures (89kB)
- 08/10/2018 - Railfuture L&SE response to Wealden Local Plan (1.5MB)
- 30/08/2018 - Railfuture L&SE response to GLA Budget & Performance Committee: “Who will pay for the TfL of the future?” (139kB)
- 31/07/2018 - Railfuture L&SE response to GLA Call for Evidence on “The Future of Rail in London” (138kB)
- 31/07/2018 - Railfuture response to ORR timetable Inquiry, Thameslink & Great Northern (150kB)
- 19/06/2018 - Railfuture response to TfSE Economic Connectivity Review (375kB)
- 29/05/2018 - Railfuture submission on Rother Valley Railway TWAO application (109kB)
- 11/05/2018 - Railfuture L&SE response to Medway Local Plan (432kB)
- 31/01/2018 - Railfuture response to NR on East West Rail central (5kB)
- 23/01/2018 - Railfuture L&SE response to Herts CC consultation on LTP4 (155kB)
- 06/01/2018 - Response to TfL Canary Wharf-Rotherhithe river crossing (20kB)
- 20/11/2017 - Railfuture L&SE response to South Downs Local Plan (25kB)
- 17/11/2017 - Railfuture L&SE response to TfL Old Oak Common Overground stations (18kB)
- 12/10/2017 - Railfuture response to consultation on Holborn station (20kB)
- 02/10/2017 - Railfuture L&SE response to Mayor of London's draft Transport Strategy 2017 (405kB)
- 30/06/2017 - Railfuture response to draft Kent Area Route Study (441kB)
- 29/06/2017 - Railfuture L&SE response on next South Eastern franchise (401kB)
- 12/03/2017 - Railfuture L&SE response to Kent CC Freight Action Plan consultation (62kB)
- 14/12/2016 - Railfuture L&SE response to Herts CC consultation on TV2050 (410kB)
- 30/10/2016 - Railfuture response to Kent CC consultation on LTP4 2016-31 (687kB)
- 12/10/2016 - Railfuture L&SE response to Barking Riverside TWAO application (125kB)
- 21/03/2016 - Railfuture L&SE response to DfT-TfL January 2016 consultation on L&SE Prospectus (197kB)
- 12/02/2016 - Railfuture response to TfL December 2015 consultation on new river crossings in E and SE London (11kB)
- 08/01/2016 - Railfuture response to consultation questions on 'London's Transport Infrastructure' (241kB)
- 08/01/2016 - Railfuture response to TfL October 2015 consultation on Crossrail 2 (51kB)
- 20/12/2015 - Railfuture L&SE response to East Sussex CC Local Transport Implementation Plan 2016/17-20/21 (11kB)
- 12/08/2015 - Railfuture response to Herts CC draft Rail Strategy (247kB)
- 21/06/2015 - Railfuture response to TfL May 2015 consultation on route options for Barking Riverside extension (10kB)
- 15/01/2015 - Railfuture response to C2C Timetable Consultation (222kB)
- 12/01/2015 - Railfuture response to Network Rail's Sussex Route Study (320kB)
- 04/12/2014 - Railfuture response to Bakerloo Line Extension consultation (180kB)
- 05/02/2014 - Railfuture response on Southeastern December 2014 Timetable (260kB)
- 04/10/2013 - Railfuture response to East Sussex County Council draft Rail Strategy (261kB)
- 27/06/2013 - Railfuture response to consultation on Surrey Rail Strategy (167kB)
- 12/09/2012 - Railfuture L&SE response to DfT on proposals for new South Eastern Franchise (197kB)
- 08/08/2012 - Railfuture response to DfT on West London service closure proposals (199kB)
- 10/05/2012 - Railfuture L&SE response to the Essex Thameside Franchise consultation (124kB)
- 03/05/2011 - Railfuture response to London TravelWatch on Chiltern services (142kB)
- 18/03/2011 - Railfuture L&SE response to Network Rail's London and South East 2nd Generation RUS (736kB)
- 30/09/2008 - Railfuture response to ORR for the "North London Railway Track Access Option application" (124kB)
Graphics, Diagrams and Computer Generated Images
- 12/11/2016 - Best Campaign Gold Award 2016 for Cambridge Heath & London Fields Rail Users Group (770kB)
- Artist's impression of new A22 bridge crossing the railway near Uckfield, by Mike Turner GRA (44kB)
Maps
- Diagrammatic map of proposed Thameslink 2 (60kB)
- Hoo Peninsula Railway - with new Higham chord (34kB)
- Hoo-Higham chord (proposed) (10kB)
- Lewes Loop proposal (156kB)
- Lewes-Uckfield rail link route options (30kB)
- Location of possible Euston Cross underground station to serve HS2 (770kB)
- Transport for London map showing the lines covered by the first phase of the Night Tube (109kB)
Photos
- 31/08/2024 - "Bridge the gap" campaign stall at Lewes Societies Fair (962kB)
- 02/06/2024 - "Bridge the gap" campaign stall in Uckfield (887kB)
- 17/03/2024 - Railfuture London Metro Press Release (240kB)
- 08/03/2024 - London Mayoral Election 2024: ''A Rail Manifesto for London'' (232kB)
- 08/03/2024 - London Mayoral Election 2024: ''A Rail Manifesto for London'' - summary (256kB)
- 02/09/2023 - "Bridge the gap" campaign stall at Lewes Societies Fair (1007kB)
- 15/07/2023 - Commendation for Best Newsletter presented to Robert Mansfield of Tonbridge Line Commuters (2.3MB)
- 15/07/2023 - Commendation for Best Social Media presented to Barbara Mine of Friends of Bishopstone Station (2.5MB)
- 15/07/2023 - Commendation for Best Website presented to Barbara Mine of Friends of Bishopstone Station (2.1MB)
- 15/07/2023 - Commendation for Best Website presented to Stewart Palmer in lieu of Rail CargoLiner (2.1MB)
- 15/07/2023 - Gold Award for Best Campaigner presented to Barbara Mine of Friends of Bishopstone Station (2.0MB)
- 04/06/2023 - Bridge the gap campaign stall at Uckfield & District Lions Club Family Fun Day (930kB)
- 09/08/2022 - Commendation for Best New Group presented to Lewes RUG (2.6MB)
- 16/07/2022 - Gold Award for Best Campaign presented to Cooksbridge Station Partnership (129kB)
- 07/09/2019 - "Bridge the gap" campaign stall at Lewes Societies Fair (1.2MB)
- 06/07/2019 - Uckfield Festival Big Day (1.2MB)
- 23/03/2019 - Alexandra Palace (177kB)
- 23/03/2019 - Alexandra Palace original station (240kB)
- 06/11/2017 - Bruce Williamson on BBC South East news about splitting TSGN franchise (969kB)
- 07/10/2017 - Francesca Caine of Hadley Wood RUG with Michael Portillo (78kB)
- 24/03/2016 - Map of proposed Crossrail 2 Eastern branch (448kB)
- 19/07/2015 - Hoardings surrounding new Lea Bridge Station (5.1MB)
- 05/05/2015 - Diesel meets electric at Gospel Oak (233kB)
- 30/01/2015 - First Javelin at Hastings highlights our campaign for HS1 services to Hastings and Bexhill (218kB)
- 30/01/2015 - First Javelin at Hastings highlights Railfuture campaign for HS1 services to Hastings and Bexhill (118kB)
- 30/01/2015 - Javelin train visits Hastings for the first time (270kB)
- 30/01/2015 - Railfuture briefs Claire Perry MP on its Uckfield-Lewes and Thameslink 2 campaigns (110kB)
- 16/01/2015 - Premonition of Uckfield route electrification (380kB)
- 31/03/2014 - Patrick McLoughlin with Amber Rudd and Greg Barker holding model Javelin train (53kB)
- 31/03/2014 - Roger Blake with Amber Rudd MP holding model Javelin train (598kB)
- 31/03/2014 - Roger Blake with Amber Rudd MP holding Shock & Ore painting (1.3MB)
- 09/01/2014 - Southern Class 171 diesel train on electrified line (737kB)
- 14/07/2012 - John Barfield at Uckfield Festival Big Day - Railfuture's first "Bridge the gap" campaign stall (620kB)
- Close-up photo of the Railfuture banner fixed to the fence at Uckfield station (100kB)
- Ian Brown standing in front of a Crossrail Tunnel Boring Machine (TBM) (724kB)
- Meridian Water station being constructed (3.8MB)
- Passenger information screen showing last day of London Bridge to Victoria service (473kB)
- Railfuture banner fixed to the fence at Uckfield station (1.1MB)
- Southern train in the distance on a railway viaduct (44kB)
- Station Pub at Uckfield next to the former station platform (10kB)
Painted Pictures
- Electrify Uckfield painting of Electrostar train at Uckfield station commissioned by Railfuture from Mike Turner GRA (444kB)
- Shock and Ore painting of Javelin train at Hastings station commissioned by Railfuture from Mike Turner GRA (106kB)
Website Pages
- Background to the Uckfield Lewes campaign
- Barking-Gospel Oak
- Current London and South East campaigns
- Eastern
- Great Northern Inners Campaign
- Hall Farm Curve
- Herts and Beds
- Kent
- L and SE rail user groups
- Lea Valley
- London and South East
- London and South East branch news
- London Metro
- Marshlink
- Need for Uckfield-Lewes
- Register your support for electrification and reopening Uckfield Lewes
- Solution for Uckfield-Lewes
- Success through incremental development
- Surrey
- Sussex and Coastway
- Uckfield business case
- Uckfield Lewes
- Uckfield line parliamentary constituencies
- Uckfield-Lewes campaign plan
Many of these documents will use the old company name (Railway Development Society Ltd). Since 1st January 2018 we have been Railfuture Ltd.
CAUTION: Older documents may no longer reflect Railfuture's current policies. Contact details may also be out of date: please always get latest details from www.railfuture.org.uk/Contact+Us.